
收稿日期: 2015-06-16
录用日期: 2015-10-15
网络出版日期: 2015-10-15
基金资助
科技支疆项目(201491124).
Application of Artificial Immune Network in Turbo-generator Set Condition Assessment and Forecasting
Received date: 2015-06-16
Accepted date: 2015-10-15
Online published: 2015-10-15
Supported by
The Science and Technology Support Project in Xinjiang (201491124).
董晓妮, 温广瑞, 张小栋 . 基于人工免疫网络的汽轮发电机组运行状态评估与预测[J]. 工程数学学报, 2015 , 32(6) : 791 -800 . DOI: 10.3969/j.issn.1005-3085.2015.06.001
/
| 〈 |
|
〉 |