Chinese Journal of Engineering Mathematics
Previous Articles Next Articles
TANG Lijun, PENG Shiyan
Online:
Published:
Contact:
Supported by:
Abstract:
Key words: flower pollination algorithm, genetic algorithm, job-shop scheduling problem, maximum completion time
CLC Number:
O326
TANG Lijun, PENG Shiyan. Hybrid Flower Pollination Algorithm for Job Shop Scheduling Problem[J]. Chinese Journal of Engineering Mathematics, doi: 10.3969/j.issn.1005-3085.2022.06.012.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://jgsx-csiam.org.cn/EN/10.3969/j.issn.1005-3085.2022.06.012
http://jgsx-csiam.org.cn/EN/Y2022/V39/I6/997