Chinese Journal of Engineering Mathematics ›› 2025, Vol. 42 ›› Issue (5): 963-973.doi: 10.3969/j.issn.1005-3085.2025.05.012
Previous Articles Next Articles
WU Wei, WANG Jibo
Received:
Accepted:
Online:
Published:
Supported by:
Abstract:
Key words: scheduling, maintenance activity, slack due-date, single machine, polynomial time
CLC Number:
O223
WU Wei, WANG Jibo. Research on Slack Due-date Assignment Scheduling with a Maintenance Activity[J]. Chinese Journal of Engineering Mathematics, 2025, 42(5): 963-973.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://jgsx-csiam.org.cn/EN/10.3969/j.issn.1005-3085.2025.05.012
http://jgsx-csiam.org.cn/EN/Y2025/V42/I5/963